The following images portray some of my work at Universty of the Pacific. All implants were placed by UoP's oral surgery faculty. All other work was completed by myself with faculty supervision.
 Amalgam Staining |  Reverse 3/4 Crown Preps |  Bonded EMAX Crowns |
---|
 Unappealing Metal Gingival MarginsExisting PFM Crowns |  Natural Gingival DisplayAll-Porcelain LAVA Crowns |
---|
 Fractured Lateral IncisorAdjacent central incisor has an existing stained composite filling. |  Pre-RestorationSoft-tissue conditioning for a natural emergence profile after implant placement, Repaired composite filling. |  Cement-Retained PFM Crown |
---|
 Unrestorable Tooth |  Post-Extraction |  Screw-Retained Implant Crown |
---|
 Missing Premolar |  Screw-Retained PFM Implant Crown |
---|
 Missing Premolar |  Screw-Retained PFM Implant Crown |
---|
 Grossly Decayed 1st MolarUpon caries excavation, it was clear that the caries had reached past the pulp chamber. |  Post Root Canal TreatmentA pre-fabricated fiber post was placed into the palatal canal to add retention to the build-up material. |
---|
 Pre-Root Canal Treatment |  Post-Root Canal Treatment |
---|